|
• |
Providing product and
price support to established and new fire pump
representatives. |
|
• |
Tracking
profit margins for the fire pump market. |
|
• |
Conducting
training seminars for fire pump representatives and
specifying engineers. |
|
• |
Working with
various groups, including upper management, on
highly-engineered projects and acting as a single point of
contact for all the elements of the domestic fire pump
market.
|
|
Selected accomplishments included: |
|
•
|
Implementing the use of integrated we based tools to help
communication with internal/external customers
|
|
•
|
Increasing the effectiveness of the Fire Pump Group in
meeting internal/external customer commitments through
building better working relationships with the network of
distributors and key groups within the production
facility.
|
|
|
Leading a team of marketing and engineering personnel to
develop a fire pump package offering for completely
fabricated pumping stations.
|
|
Sargent
& Lundy (LLC)
Chicago, IL
5/1997-2/1999
Mechanical Engineer II
Sargent
& Lundy is a global leader in professional consulting
services for the electric power industry.
Main responsibilities included:
|
|
|
Managing a team of engineers to support the design,
modifications, upgrades and operation of nuclear power
plants in the northeast United States.
|
|
|
Developing project schedules and leading a team of
mechanical, electrical and structural engineers to
generate relevant drawings and perform critical analyses. |
|
Selected accomplishments included: |
|
|
Nine
Mile Point Unit 2 (3467 MWt Boiling Water Reactor)
- Implemented program that allows remote access to
the system and component database found on the utility's
server.
|
|
|
Hydrogen Water Chemistry Injection (HWC) System
Modification
-
Designed process piping of $500,000 system to mitigate
intergranular stress corrosion cracking (IGSCC) phenomena |
|
|
Service
Water System Hydraulic Modeling & Accident Analysis -
Acted as an on-site liaison for the analysis of a 60,000
gpm water system. |
|
|
Ventilation System Performance Evaluation -
Examined the ability of HVAC equipment to maintain
habitable conditions in various areas. |
|
Monsanto Searle
Skokie,
IL
5/1996-8/1996
Field
Engineer Intern
|
|
Monsanto Searle is an innovative research-based company
that develops and manufactures prescription
pharmaceuticals and other healthcare solutions to a $2.9
billion worldwide market. |
|
Main responsibilities included: |
|
|
Field
verification of buildings HVAC drawings.
|
|
|
Implementing HVAC plans into AutoCAD library file. |
|
Selected accomplishments included: |
|
|
Increasing the Operations and Facilities Groups efficiency
in handling HVAC issues file. |
|
APV
Crepaco
Rosemont, IL
8/1994-12/1994
Project
Engineer Intern
|
|
APV
Crepaco is a worldwide network of consultants involved in
system design and customer for applications involved in
fluid handling, mixing & blending and continuous freezing
equipment. |
|
Main
responsibilities included: |
|
|
Analyzing plant schematics and P&IDs to optimize
processing systems for the food/beverage industry. |
|
|
Involvement in the specification and procurement of
equipment. |
|
|
Leading a team of marketing and engineering personnel to
develop a fire pump package offering for completely
fabricated pumping stations.
|