Resume: Prad R. Kshatriya, P.E.

Extremely organized and adept project manager and engineer with experience in implementing high priority projects within budget. He possesses outstanding communications, problem solving and negotiation skills.  He is particularly capable of instituting effective working relationships with team members and clients.  His technical skills include extensive knowledge and experience in design and project management for public and private sector projects including water, wastewater, drainage, and site development.

EXPERIENCE

Greeley and Hansen LLC – Phoenix, AZ
Involved in several different projects as follows:

Western Canal Water Treatment Plant – Master Plan.   Project consists of development of master plan for the Western Canal Water Treatment Plant.  Nyah Engineering, Inc. is part of the team with Carollo Engineers to provide cost estimate and program schedule.

 

Digester No. 6 Dome Replacement at 91st Avenue Wastewater Treatment Plant. Project consists of removal and replacement of existing dome.  Nyah Engineering, Inc. is part of the team with Kennedy Jenks Engineers to provide Project Management Services.

 

New Fire Hydrant Installation Project for the City of Phoenix.   Project consists of design of new Fire Hydrants in the existing sub-division to provide additional Fire Protection.

 

Buckeye WWTP Modifications.   Currently Mr. Kshatriya is providing construction management services.  Project consist of new fifty foot diameter clarifier, modifying the existing oxidation ditch, constructing a return activated sludge pump station, and construction of Belt Filter Press.

 

Lake Pleasant Water Treatment Plant for the City of Phoenix.   Accomplished conceptual design and cost estimate for the head works of the Treatment Plant Facility.
91st Avenue Waste Water Treatment Plant - Unified Plant (UP01) Design Project Fire Hydrant Installation Project for the City of Phoenix.   Prepared Opinion of Probable Construction Costs at “Conceptual Planning Level” for several parts of the projects.

 

23rd Avenue Waste Water Treatment Plant Head Works Modifications, Influent Pump Station and Influent Interceptor Upgrade for the City of Phoenix.  Responsible for administration, shop drawing reviews and other construction related tasks for the construction of the $25 Million dollar facility.  Influent Interceptors, water main replacement, storm sewer replacement and other utilities were also major part of the project off site.

 

Represented the City of Phoenix for management of several projects by coordinating and conducting meetings and submittal reviews for each project.  The projects are listed below:

1.
91 st Avenue Waste Water Treatment Plant Three-Phase Digestion Project.
2.
23 rd Avenue Waste Water Treatment Plant, Chlorine Replacement Piping Project.
3.
91 st Avenue Waste Water Treatment Plant, Chlorine Replacement Piping Project.
4.
23 rd Avenue Waste Water Treatment Plant, Three-Phase Digestion Project.

Managed above projects by coordinating and conducting meetings and submittal reviews for each project.

Mr. Kshatriya was responsible for design and construction of numerous projects while working with Walter E. Deuchler and Associates. Main responsibilities included designing, developing bid documents, site planning, coordinating with government agencies, coordinating construction, assisting in startup of the newly constructed facilities and leading a team of engineers.

Selected projects include:

22.5 Million Gallons per Day (MGD) Combined Sewer Overflow Treatment Facility:

1.
This combined sewer overflow treatment facility included preliminary treatments such as bar screens, grit removal system, storm water pumping, primary clarifiers, chlorine contact tanks, de-chlorination, aerators, flushing system, chemical storage and feed system, conveyor, overhead cranes, instrumentation, electrical, heating, ventilating, odor control, outside piping and sewers, grading, walkways, roadways, fencing, and land-scaping.
2.
Accomplished design and completed construction successfully within the budget of $8.5 million.
3.
The plant is in operation and received an award from American Public Works
Association in recognition of excellence and dedication to public service


Indian Creek Interceptor sewer and East Bank Overflow sewer project in the City of Aurora:

1.
This project consisted of collection of three major overflows in the City of Aurora and conveyance of the combined sewage flow to the treatment facility.
2.
Accelerated construction of this project to be completed in time and within the budget of $5 million.

Sub-division Layout and Construction

1.
Responsible for designing sub-division for 125 lots.  Design included sub dividing lots, survey, water main, sewer lines and other utilities, roadway and grading.
2.

Responsible for construction of roadways, Utility coordination was a major task.


1989 Fox Metro Water Reclamation District Plant expansion:

1.
Assisted in design work for new bar screen an grit facilities, remodeling the
existing bar screen and grit facilities, installing three new primary clarifiers and equipment, installing fine bubble diffusers, installing one new final clarifier and equipment, remodeling two existing clarifiers, installing polymer addition system and new air compressors, installing new drainage system for the sludge storage area, under ground process piping, electrical, heating, ventilating and site work.
2.
Led the construction, startup and completion for this project, which was
completed within a budget of $11 million.


Sullivan Roadway Design and Construction

1.
Led design and construction of five mile long four lane roadway construction through the urban area of the City of Aurora
2.
Roadway design and construction included replacement of water main, sewers and other utilities.  Utility coordination was prime concern for this project.
3.
Introduced lime stabilization for the sub-grade preparation of the roadway.

 

Glen Ellyn Capital Improvement Projects

1.
Responsible for design and construction of roadways, water main replacement, sewer replacement and other associated utilities for the entire town.
2.
Replaced deteriorated and corroded water mains with ductile iron water main for selected areas of town.

 

REGISTRATION
Registered licensed Professional Engineer with the State of Arizona with Proficiency in the field of Civil Engineering

EDUCATION
Bachelor of Science in Civil Engineering
Awarded June 1969
M.S.University of Baroda, India

MEMBERSHIPS
Indo American Engineers/Architects of Arizona - President
American Water Works Association